Profession Information

Mobile Toilet Installation Tutorial

Diagram of mobile toilet installation tutorial


The first step: install the mobile toilet base

640

1. Place the back panel of the toilet flat on a clean and flat place on the ground
 

640 1

2. Adjust the direction of the base so that the sewage outlet of the base is aligned with the sewage hole on the back panel of the toilet

640 2

3. Combine the base with the back panel of the toilet and adjust the alignment

640 3

4. Install the base and the fixing slot on the back panel 

640 6

(drive in the fixing nails after installation)

Step 2: Install the right panel of the mobile toilet

640

1. Put the bottom of the right panel into the card slot

640 1

2. Push it in until it is aligned with the base

640 2

3. Install the base and the fixing slot on the right panel

640 3

(drive in the fixing nail after installation)

 

Step 3: Install the left panel of the mobile toilet

640

1. Put the bottom of the left panel into the card slot

640 1

2. Push it in until it is aligned with the base

640 2

3. Install the base and the fixing slot on the left panel

640 3

(drive in the fixing nails after installation)

 

Step 4: Install the front panel of the mobile toilet

640 4

1. Put the bottom of the front panel into the card slot

640 5

2. Push it in until it is aligned with the base

640 6

3. Install the base and the fixing slot of the front panel

640 7

(drive in the fixing nails after installation)

 

Step 5: Install the upper fixing slot

640

1. Align the fixing slot with the part to be installed

640 1

2. Push it in until it is aligned

 

640 2

3. Complete the installation of other fixing slots in turn 

640 3

(insert the fixing nails after installation)

 

Step Six: Install Ventilation Louvers

640

1. Align the ventilation louvers to the installation site

640

2. Take advantage of the trend

640 2

3. Complete the installation of other ventilation louvers in sequence

640 3

 

 

Step Seven: Install the Top

640

1. Align the top with the surrounding distance

640 1

and drive in the fixing nails to fix it

 

Step 8: Complete the overall frame installation of the toilet

 

1. Two people work together to erect the toilet to complete the overall frame installation of the toilet

640 2

 

You Might Also Like

Send Inquiry