Acceptance Standards For Scaffolding Projects

The inspection specifications for scaffolding projects mainly show the following aspects: The quality of the materials used in the scaffolding must meet the requirements. The scaffolding has a solid foundation, no water,scaffold and a slab that meets the requirements. The horizontal error of the full length of the large crossbar shall not exceed 6cm. The straightness error of the vertical rod shall not exceed 1/200 of the erection height,scaffold and the deflection of the small crossbar shall not exceed 1/150 of the length of the rod,scaffold and the interval step of the rods shall meet the planning requirements. There must be a satisfactory connection point, one for every 4m in the straight interval and one at the 6m in the horizontal interval,scaffold and the connection to the building is strong and reliable.

The work layer plank should be strict, flat and stable, and the corners should be circled (that is, the vertical scaffold board and the horizontal scaffold board are crimped in place). The length and width of the plank should be in place,scaffold and there should be no probe board. The raw materials of the scaffold board meet the requirements. For working face protection, stand up safety nets and toe boards or tie two guard rails, add 18cm toe boards,scaffold and seal the end of the working face. The safety net must have the factory certificate and the inspection certificate,scaffold and the flat net should be high outside and low inside, tightly overlapped, and the force is even. The vertical net and the large crossbar are bound firmly, and the bottom of the vertical net should be pressed under the scaffold of the working surface. (Mostly failed)

After the external scaffolding is erected,scaffold it must be checked and signed by relevant personnel before it can be put into use. Achieve layered erection, layered inspection,scaffold layered application, and timely reinforcement when problems are found. After passing the inspection,scaffold the outer scaffolding is not allowed to be dismantled or modified without permission.


You Might Also Like

Send Inquiry